| | |
|
|
|
|
1. Our Villa was moved from Dannevirke to the Kapiti Coast in two pieces! *Viewed: 2979 times.
|
2. The roof was removed for the move - and had to be re-built once on site. Viewed: 1867 times.
|
3. House back together - now the external renovations begin! Viewed: 1522 times.
|
| | |
| | |
|
|
|
|
4. Front under verandah - started! Viewed: 1961 times.
|
5. Front under verandah stripped! Viewed: 2037 times.
|
6. Front under verandah painted! Viewed: 1865 times.
|
| | |
| | |
|
|
|
|
7. The back of the house - where we have plans to remove the door and insulate. Viewed: 1608 times.
|
8. Stripped back to the bare timber and the door nearly gone and insulation going in. Viewed: 1785 times.
|
9. First coat of paint - what an improvement (and no door!) *Viewed: 1691 times.
|
| | |
| | |
|
|
|
|
10. Using the ladder hook to hold the
Speedheater whilst not in use. *Viewed: 1670 times.
|
11. Removing the paint on the verandah using the Speedheater 1100 and the Tripod attachment. The thick paint comes off in one go! Viewed: 2225 times.
|
DSCF0025 *Viewed: 1630 times.
|
| | |
| | |
|
|
|
|
DSCF0076 *Viewed: 1544 times.
|
DSCF0034 *Viewed: 1440 times.
|
DSCF0075 *Viewed: 1471 times.
|
| | |
| | |
|
|
|
|
DSCF0078 *Viewed: 1478 times.
|
DSCF0081 *Viewed: 1423 times.
|
DSCF0085 Viewed: 1498 times.
|
| | |
| | |
|
|
|
|
|
|
|
|
| | |
| | |
|
|
|
|
|
|
|
|
| | |
| |
|
|
|
DSCF0126 *Viewed: 1509 times.
|
DSCF0124 *Viewed: 1828 times.
|
| |